Services
Obtaining initial permits
            It is necessary to collect and execute the IRD package if you have plans to build, reconstruct or improve the technical and economic indicators of a residential building, shopping center or other commercial real estate.
        Development of architectural and urban planning concept
            The first step in the design of a new facility is an architectural concept, which should take into account all the wishes of the customer and the requirements of urban planning regulations.
        Development of design and working documentation
            Project documentation is a textual and graphic material that defines the architectural, technological and engineering solutions required to ensure the construction, reconstruction and technical re-equipment of capital construction projects, which include, but not limited to, buildings and structures included in the industrial cleaning complex sewage.
        Passing examination of design documentation
            Non-state, state, or the main state examination of the object (according to the Urban Planning Code of the Russian Federation)
        Preparation of a set of documentation for obtaining permission to build an object
            The collection, preparation and receipt of permits in government bodies (including the GPZU, building permits)
        Conducting architectural supervision of the construction of the facility
            Quality control of construction or reconstruction works carried out by the contractor in accordance with the design documentation.
        Measurement work using a 3D scanner and an inventory of the object
            A modern laser scanner allows you to get a cloud of points of high density and accuracy, and also combines it with panoramic photos, which allows you to get 3D models of any complexity.
        Obtaining permission to commission the facility
            Collection, preparation and receipt of permits in government bodies (According to Article 55 of the Town Planning Code of the Russian Federation)
        Obtaining initial permits
            Array
        Development of architectural and urban planning concept
            Array
        Development of design and working documentation
            Array
        Passing examination of design documentation
            
        Preparation of a set of documentation for obtaining permission to build an object
            
        Conducting architectural supervision of the construction of the facility
            
        Measurement work using a 3D scanner and an inventory of the object
            
        Obtaining permission to commission the facility